                            professional manufacture Cement production plant(100-1500 tons per day)

professional manufacture Cement production plant(100-1500 tons per day)

Professional Manufacture Cement Production Plant(100-1500 Tons Per Day), High Quality Small Scale Cement Production Plant,Small Cement Production Plant,Professional Cement Production Plant
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Condition:
New
Production Capacity:
100-5000t/d
Place of Origin:
Hunan, China (Mainland)
Brand Name:
Juxin
Model Number:
Specification
Voltage:
380V
Power(W):
Spesification
Dimension(L*W*H):
Spesification
Weight:
Specification
Certification:
ISO9001:2008, BV
Warranty:
1 Year
After-sales Service Provided:
Engineers available to service machinery overseas
Raw materials crusher:
PE600x900 Jaw Crush
Rotary kiln:
According to your capacity
Limestone Stoker:
DB550/20
Limestone Reclaimer:
QG250/31
Raw Meal Vertical Roller Mill::
GRMK46.41
High Temperature Fan at Kiln Tail:
2083 BB50
Rotary Kiln:
3.2*50
Vertical Roller Mill:
GRMC22.30
Rotating Packing Machine x2:
4BBX(SG)
Packaging & Delivery
Packaging Details
Standard export packing
Delivery Time
20-25 working days

 

Product photo

 

 

professional manufacture Cement production plant(100-1500 tons per day)

Product Description

 

1. Crushing and Pre-homogenizing:
Most of the raw materials, like limestone, clay, iron ores, and coal, should be crushed before their pre-homogenization. Limestone is the primary material in this line, and due to its large particle size and high hardness, its good crushing plays an important role in the whole line. Special stacking and reclaiming technology has been used in the pre-homogenizing process so that raw materials can be better primarily homogenized.

professional manufacture Cement production plant(100-1500 tons per day)

2. Raw Meal (raw material) Preparing:
Since the raw meal grinding work takes up more than 30% labor force in the whole dry process cement production line, it is quite important to choose appropriate grinding equipment and technological process so that high-quality products can be obtained.


3. Raw Meal Homogenizing:
The raw meal homogenization is a key factor for stable clinker calcination.

 

professional manufacture Cement production plant(100-1500 tons per day)

 

4. Preheating and Decomposing:
The preheater is used to preheat as well as decompose raw meal. So the length of the rotary kiln is effectively shortened. And the raw meal can fully exchange heat with the hot gases from the kiln. Because of its rapid and high-efficiency heat transfer, the production efficiency and heat consumption of this production line are greatly improved.

 

professional manufacture Cement production plant(100-1500 tons per day)

5.Clinker Calcining:
After its preheating and pre-decomposing, the raw meal will be calcined in the rotary kiln, where the generated carbonate will be further decomposed. Meanwhile, a series of solid phase reactions will take place.

professional manufacture Cement production plant(100-1500 tons per day)

6.Clinker Cooling
the high tempreture clinker from rotary kiln, after cooling by cooling machine, is transported to the next process:storage and cement grinding machine.

professional manufacture Cement production plant(100-1500 tons per day)

7. Cement Grinding:
As the last process, the cement grinding will consume a great deal of electricity. And in this process, special size granule cement will be obtained.

professional manufacture Cement production plant(100-1500 tons per day)

8. Cement Packaging:
The cement can be transported in bulk or in bags.

professional manufacture Cement production plant(100-1500 tons per day)

Equipment Supply for cement production line   
1. Crushing Equipment :   Jaw Crusher, Impact Crusher , Hammer Crusher ,Cone Crusher, Compound Crusher ect.
2.Grinding Mill : Ball Mill , Remond Mill , Vertical Mill , Grinding Machines
3. Rotary Kiln / Machnical Vertical Shaft Kiln
4. Preparation Equipments: :Powder Concentrator , Vibrating Feeder, Megnetic Separator ect.
5. Preheater
6. Dyer , Cooler ,
7.  Elevator , Belt  Conveyor  & Bucket Equipments
8.  Cement Packing Equipments
9.  Classifier , Dust Collector

 

Company Information

 

professional manufacture Cement production plant(100-1500 tons per day)

 

 

professional manufacture Cement production plant(100-1500 tons per day)

 

 

 

professional manufacture Cement production plant(100-1500 tons per day)

 

Our Services

Pre-sale:Enthusiastic

We offer you the early planing of the project,the best process flow design,choose the best appropriate equipment model to design products according to your special needs.

Sale: Integrity
All productds have to pass strict inspection with the drawings and process flow according to the contract before
they go out.We assigned the technicians to the producing spot to provide installation guide, testing and training.

After-sale:Considerate

To establish good business relationship,we adopt periodical visit to the users.We could give you the definite reply during 24 hours when the users meet some problems in the producing process.

Attention

1.We should install the machine under shelter from rain and do not put it in the open air directly.

2.Electric motor should be installed in the rear of the crusher and the direction of rotation should be consistent 

with the crusher. Reverse is forbidden.

3.The machine has six ground screws fixed on the concrete flood. The foundation need a place left for 

discharging the ore stone and the scope is not less than 50°. The base form should be decided by the users 

according the model of the feeder and transportation facilities.

4.Before debugging the equipment, we should tighten the screws and connect parts and check the lubrication 

conditions.

5.After launching, the machine should reach normal speed before feeding. The material should be inserted 

from the front and do not from the side in case of overload caused the accident.

6.Feeding must be stopped before stopping the machine. Only all the material have been broken is spit out

 entirely, stopping working is available.

 

FAQ

Q:Payment                                                                                                                                                          
A:30% by TT as deposit on signing the contract, 70% by as final payment of balance after the client’s satisfactory inspection of the equipment prior to the goods leaving the factory.

Q: What about Warranty? what will we do if the machine is broken down                 

A: The warranty period for all of structural and mechanical equipment is one year. The warranty period for all electric motors is half one year. Wear parts are not covered by warranty unless the component part is found to be flawed.
 
Q: What should we need to do for if we want to get a best quotation                     
A: Hi, if you want us recommend a suitable type for you ,please let us know  as follows:
1).the capacity (tons per hour )

2).feed size
3).output size

Q: What could you help me to do for the business ?                                                                                    
A: Many thanks for your trust , we can provide you with proposal chart for complete production lines,spot inspection and operator traning according to your demands and the conditions of applied spot , we can help you choose the right equipments ,drilling rig ,loader ,trucks ,excavators and so on for rotary washer for sand washing.
 
Q:Delivery time                                                                                                       
A: Standard delivery time is 30 days from receipt of deposit,the special required machine is 45 days.